Rehabilitation of the bicycle path

Name of the project: rehabilitation of the bicycle path on the territory of the boulevard

Project description: the existing bicycle path from the old boulevard to the new boulevard, near the amphitheater, was reconstructed, the old bicycle path was rehabilitated, and a monolithic reinforced concrete bicycle path according to modern standards was arranged, which in total is 6,000 longitudinal meters. The works are carried out by the company "Aral" LLC, the winner of the electronic tender.

Budget: 1,998,040 GEL will be spent from the boulevard budget for the reconstruction of the bicycle path.