18.05.2023

The rehabilitation of the children s corner in the old boulevard is at the final stage

As part of the project, the children s entertainment corner was expanded and up to 20 new wooden attractions were added. The children s infrastructure has been completely renenewed: the surrounding area has be improved with ramps, concrete decorative tiles and basalt curbs; Laying of rubber covering on the lower and upper pitches has started.

The cost of the project is 342 thousand GEL.